Klemetsrudanlegget AS - Carbon Capture Project –

Client: Klemetsrudanlegget AS
Project:
Carbon Capture Project “Klemetsrudanlegget AS”
Scope:
Study
Date:
April 2017 – September 2017
Mhrs:
6000 Mhrs
Location:
Oslo – Norway

Selected sites for CCS project are:

  • Klemetsrudanlegget AS - Oslo
  • Yara, Porsgrunn
  • Norcem

Status:

  • Decision to go for concept development and FEED studies
  • FID in Q2 2019 and operation start in 2022

Selection criteria:

  • Technology qualification at Technology Center Mongstad(TCM)
  • Price and delivery

Scope of Work:

The Scope of Work for this CCS project, was to prepare the design of a plant capable of capturing the CO2 from the KEA Energy-from-Waste and to make it available for pipeline transportation in a dense gas phase, liquefy it at the harbor and store it in interim storage tanks at harbor. The scope of work included the following main topics;

  • Concept selection/design for carbon capture (CC) plant.
  • EfW and CC plant integration.
  • Pre-conditioning of CO2 at KEA site for pipeline transport to harbor.
  • Liquefaction of captured CO2 at harbor.
  • Intermediate storage at Oslo harbor with offloading facilities for CO2 transport ships.

The final report consisted of:

  • Description and Layout of the complete CO2 capture concept.
  • Risk analysis.
  • Budget +/-20%.
  • Schedule.

Contact

Stavanger HQ

Moseidsletta 122
4033 Stavanger
Norway
+47 51 63 90 00

Bergen

Espehaugen 45
5258 Bergen
Norway
+47 51 63 90 00

Hammerfest

Strandgata 40,
9600 Hammerfest
Norway
+47 51 63 90 00

Warehouse Forus

Gamle Forusvei 12
4033 Stavanger
Norway
+47 51 63 90 00

Invoice

APPLY AS
P.O. Box 8040
4068 Stavanger
Norway

Electronic invoice:
Send email
Moreld Apply is a leading multi-discipline engineering company, specializing in contracts across all project phases - from concept development and studies to completion and commissioning.
Address:
Moseidsletta 122, 4033 Stavanger

Phone:
+47 51 63 90 00

Email:
firmapost@apply.no