Goliat FPSO Topside Modification for Alke Tie-in

Assess Goliat Topside Modification requirements for receiving gas from newly discovered Alke field including processing and export of gas either to CNG tanker or to Barents Sea Pipeline.

Client: Eni Norge (now Vår Energi)
Project:
Alke tie-in to Goliat FPSO
Scope:
Pre-Feasibility Study and Cost Update
Date:
2017- 2018
Mhrs:
5000 mhrs
Location:
Barents Sea, Norway

APPLY developed the EPCIC cost along with sensitivity analysis with respect to contingency, without TEG system and third stage compressor.

Alke gas production is estimated as 3.2 mill. Sm3/d and topside installation is expected to be increased with 815 ton in order to facilitate the compression, metering, TEG injection and gas export processes.

Scope of Work:

  • Technical feasibility analysis for three different concepts
  • In depth market analysis for procurement items
  • EPCIC cost and plan
  • Cost sensitivity analysis

Added value: New segment where APPLY aiming to grow

SHARE THIS POST