Client: Eni Norge (now Vår Energi)
Project: Alke tie-in to Goliat FPSO
Scope: Pre-Feasibility Study and Cost Update
Date: 2017- 2018
Mhrs: 5000 mhrs
Location: Barents Sea, Norway
APPLY developed the EPCIC cost along with sensitivity analysis with respect to contingency, without TEG system and third stage compressor.
Alke gas production is estimated as 3.2 mill. Sm3/d and topside installation is expected to be increased with 815 ton in order to facilitate the compression, metering, TEG injection and gas export processes.
Added value: New segment where APPLY aiming to grow